With more and more high rise buildings appearing all above the world, high rise building cleaning has become more and more important. Exterior works of high rise building include high rise home window cleaning, exterior wall cleaning, curtain wall clean, high-rise external wall paint, concrete floor repairs, sealing and even aerial advertising unit installation etc. The post mainly introduces typically the suspended platform (swing stage) application on the high climb building facades cleansing, and its benefits than BMU plus Bosun's chair.

According to the characteristics of high-rise building, the primary equipments that happen to be used in external wall cleaning contain three kinds because below:

1. Developing Maintenance Unit, also is called BMU
2 . Temporary Suspended Program or Swing level
3. Bosun's chair

The BMU is a special equipment regarding exterior wall washing of high-rise developing. Its main usage is cleaning exterior wall of modern high-rise building, which usually change the traditional suspended work operation directly into automatic, efficient, higher quality mechanical functioning. It is typically the latest generation regarding powerful exterior walls cleaning robot, in addition to fills up the particular blank from home to overseas in high-rise building outdoor wall maintenance. Throughout China, some of elderly high-grade constructions, which often were built in 80-1990s, were designed by foreign can be and they had considered the set up of BMU given that then and used abroad BMU to be able to maintenance building. These kinds of efforts have set a good groundwork for building cleaning up. But since 1990s, now there are many buildings had not regarded as the application of BMU when they have been designed and some of them can not really be installed BMU, at the same time, BMU does not belong to common products and also frequently bring higher cost, most of those business lead to BMU has not been extensively used nowadays.

Mainly because of Bosun's Chair's flexibility, it offers been widely followed in the entire world. Yet , as its risk functioning and often brings injuries, the Bosun's Couch has been more and more replaced by suspended function platform. We believe this is the tendency involving development. Now, inside China, many cities have previously stipulated that in aerial function cleaning, workers need to use suspended function platform and prohibit to work with Bosun's Seat, in order to avoid more accidents happening.

The hanging work platform is a new sort of aloft working machinery. Because associated with  Rope Access Facade Specialists Queen’s Park 's operate efficiently, comfort, safety, strength saving etc, it is often widely used in domestic decoration and even cleaning industry.

The particular main materials involving exterior wall consist of glass curtain wall, Aluminum composite plate, marble, granite, mosaic, ceramics, drying gross stone, granitic plast typer stone etc. Because of to the dust, grease and chafing caused by acid rainfall (fog), the completely new buildings become smudgy easily in other words moment, especially in several serious air pollution cities.

According to be able to the weight-bearing ability, the suspended job platform can get divided into 1000kgs, 800kgs, 600kgs, 500kgs and even 250kgs etc. According to the duration of platform, it consists of 10m, 7. 5m, 6m, 4m, 2m and so forth. The size of platform can be assembled to go well with several requests. At this point the main types that are usually applied in cleaning industry include swing level ZLP630 and ZLP250 and the duration went from 6 to be able to 10 meters will be more popular.

Preparation work before building

1. Check the function site and assure the plan. Examine the roof condition and be sure that it may be installed hanging work platform in addition to sure the movement has no barrier like neon lighting and billboard. The engineers design construction plan.

2. To guarantee the construction environment without wind, snow plus high temperature, small temperature phenomenon. The particular wind in site should less as compared to 6 levels.

3 or more. Prepare cleaning equipment for example bucket, weapon, towels and sucker etc .

4. A couple of workers carry cleansing tools, get directly into platform cradle in addition to fasten safety devices.

Do safety assessment before operation.

a single. To check the each parts found in suspended work platform(swing stage), for assessment, if the fasteners, fittings, hoister, plus safety protection devices in good express and confirm no hidden dangerous just before work.

2. To check whether or not the delay, pause mechanism attached to roof structure, fasteners, drawing rope are firm in addition to confirm no concealed trouble functioning.

several. To check the length of safety rope and see if there had been any damage or even broken stocks upon it.

4. Repaired the safety string and confirm typically the length is a lot more than building elevation.

5. To check on the insurance belt worker used no damage.

6. To check out if the protection lock are flexible and reliable.

7. To be able to check if typically the fixed position in which the safety rope joined topping setting up is firmly.

8. To check if the staff dresses satisfy the following needs: wearing a helmet and wearing long-sleeved work jacket plus long pants. Found in corrosive environment, let workers wear corrosion proof clothes and shoes and boots with soft bottom level, which also top features of corrosion-resistant.

9. To see if the junction involving safety rope and even building parapet provides the liners. If located no, we should be stop functioning immediately.

10. The employee's self-lock unit installed on insurance belt should become knotted on basic safety rope, not buckle in suspended program.

11. Please established up the boundary in operation region and arrange one particular ground security expert to preventing pedestrians. If no safety officer or safeguarding fence, we ought to stop the work. 10. Check the perspective of workers which operate in top of buildings, in the event that have some problems, stop working.

Operation method

1. Use drinking water gun to scrub edges and remove dirt.

2. Dip spreader into barrels in addition to after it completely absorb sanitizer, we smear evenly on the surface of glass. Later use wiper scrape goblet up and lower including frame and even corners. Ensure to be able to pull crossly with no miss some little place and then simply use towel dry it.

3. Right after finishing one location, area platform transfer to the below site and once finish the cleaning coming from top to base, we turn kept or directly to adjacent position and keep on to work from top to bottom again.

4. After finishing total operate, sorting machines plus tools and take out fences and billboard and clean the water on surface.

5. Cleaning in addition to maintenance equipments in addition to after removing particles and dirt all of us pack the system in warehouse.